Listening Library

Listening Library


Latest Episodes

248: CH 5 - Part 1- Traffic Patterns & Landings
January 29, 2019

Traffic Patterns and Landings Intro Letdown and Traffic Entry-(00:27) Aircraft Configuration-(01:57) Overhead Pattern and Landings-(05:36) Intitial-(05:48) Break-(06:38) Inside/Closed Downwind-(08:10) Perch and Final Turn-(10:20) Final-(13:51) Straight-I

Systems: Fuel Supply System
January 23, 2019

Info from the Dash 1 Fuel Supply System

Systems: The Aircraft and Engine
January 23, 2019

Info from the dash 1. The Aircraft: (00:00) Engine: (02:30)

248: CH 1 - General Information
January 21, 2019

TBD

248: CH 4 - Takeoff, Climb and Leveloff
January 18, 2019

Introduction Lineup Check. (00+30) Takeoff. (01+35) Static Takeoff. (02+52) Rolling Takeoff. (03+28) Takeoff Roll. (03+47) Crosswind Takeoff. (05+18) Abnormal Procedures. (08+00) Turns After Takeoff. (08+54) Straight Climb from Level Flight. (10+19) Climb

248: CH 3 - Ground Operations
January 18, 2019

Ground OperationsPreflight Check. (00+11)Aircraft Forms. (00+40)Before Exterior Inspection. (01+00)Exterior Inspection. (02+00) Seating Position in the Aircraft. (03+00)Cockpit Organization. (03+34)  Interior Inspection. (04+00)Engine Start.