Static Bursts

Static Bursts


Installing ESD Flooring in a 24/7 facility without disrupting operations

June 16, 2019

Installing a floor in a 24/7 operational facility comes with its own set of challenges. As with any flooring installation, it's important to consider logistics: Will chemicals be used? Adhesives? Coatings? Are there toxins or odors to deal with? What is the condition of the current floor or subfloor? Will the old floor require removal? Dave and Rick discuss the optimal way to install an ESD floor in 24/7 operational spaces - without adhesive or chemicals and with neither downtime nor disruption.